The Cost Estimator Calculator helps architects, contractors, and developers create detailed construction cost estimates using industry-standard formats. Calculate project costs by UniFormat or MasterFormat categories with location multipliers, escalation factors, and contingency.
Accurate cost estimation is critical for project feasibility, budgeting, and bid preparation. The calculator supports both UniFormat (design-phase) and MasterFormat (construction-phase) cost breakdowns, allowing estimates at any project stage.
Enter quantities, unit costs, and project parameters to build comprehensive cost estimates. The tool includes location cost multipliers, escalation factors, and contingency calculations, helping create professional cost estimates for residential, commercial, and institutional projects.
Features
Everything you need
- UniFormat and MasterFormat support
- Location cost multipliers
- Escalation and contingency factors
- Multiple building type templates
- Cost breakdown by category
- Export to CSV and PDF
- Project phase tracking
How it works
Simple workflow
- 1Select estimate format (UniFormat or MasterFormat)
- 2Add line items with quantities and unit costs
- 3Apply location multipliers and escalation
- 4Add contingency percentages
- 5Review total project cost breakdown
Use cases
Built for real-world scenarios
Project budgeting
Create preliminary cost estimates during early design phases for project feasibility.
Bid preparation
Develop detailed cost estimates for contractor bid submissions.
Cost planning
Track costs by category and phase throughout project development.
Value engineering
Compare cost alternatives and identify cost-saving opportunities.
FAQ
Frequently asked questions
UniFormat organizes costs by building elements (A10 Foundations, B20 Exterior Walls) for design-phase estimates. MasterFormat organizes by trade/construction (03 Concrete, 07 Thermal/Moisture) for construction estimates.
Location multipliers adjust costs for regional price differences. Example: San Francisco 1.35×, New York 1.25×, Dallas 0.95×. Multiply base costs by location factor for local pricing.
Typical contingencies: Design Development 15-20%, Construction Documents 10-15%, Bidding 5-10%, Construction 3-5%. Higher contingencies for less-defined projects.
Apply annual escalation rate (typically 3-5%) based on time to construction start. For 2-year delay at 4%: Escalation = (1.04)² - 1 = 8.16% increase.
Have a suggestion?
We're always looking to improve our calculators. If you have ideas for new features, improvements, or found something that could work better, we'd love to hear from you.
Industries
Popular in these fields
Use cases
Perfect for these workflows
Get the desktop app
Access all calculators instantly with a global keyboard shortcut. Works offline, syncs across devices, and integrates seamlessly with your workflow.